Project

5 TPH@10 bar(g) STEAM BOILER PLANT

Client

Coca Cola Beverages Sri Lanka Ltd

Installation of 5 TPH/10 bar(g) bio-mass steam Boiler plant at Coca Cola Beverages Sri Lanka Ltd at Biyagama. Steam Boiler supplier – Veesons energy Systems pvt ltd, India.

Dates Employed

Nov 2012 – Jan 2013

Employment Duration

3 Months

Project Value

USD 158,000

5 TPH/10 bar(g) bio-mass steam Boiler

Type of Boiler
Package type (internal furnace)- Horizontal Multi tubular fully wet back three pass smoke tube boiler
Solid fuel
Rubber wood logs
Feeding method
100% manual
Mode of combustion
Balance draft (Mechanical draft)
Air pollution control system
Includes MDC (mechanical Dust collector) and Wet bottom with water Spray.
Heat Recovery unit
APH (Air pre-heater)
Start Erection work
20th December 2012
Date of commissioning
05th of January 2013
Want to know more ?

Please fill the below details and send us.

    To make requests for further information, contact us

    Make a Call
    +94 11 268 0095
    E mail us
    [email protected]
    For Calibration Services
    [email protected]